District Heating Cucciago

In 2010 Aldar completed Energy Audits on eight public buildings for the town of Cucciago near Como. Based on the analysis undertaken by Aldar, Esedera Energia took part in and won a public tender organised by the town council to provide an Energy Plus Service.

The audits were undertaken in autumn 2010 and included a feasibility study of a biomass fuelled district heating system.

In developing its bid, Esedera reported the proposals identified by Aldar in the Energy Audits; including the proposal to introduce a mechanical ventilation system with heat recovery for the town nursery school, introduction of destratification fans for the town gym and the creation of a mini district heating system powered by a 450 kW biomass fuelled boiler.

Having won the bid, Esedera commissioned Aldar to design the layout of the main power station and the eight sub-stations. Work was completed in 2012.

Client: Esedra Energia Società Coop. Soc.

Period: 2010-2012